Chandrayaan-3 Mission 2023: ISRO Launch Date, Time, Place, Budget,

Chandrayaan-3 Mission 2023: Chandrayaan 3 was launched on Launch India’s third lunar mission, Chandrayaan 3 on Friday, July 14, at 2:35 pm. from the Satish Dhawan Space Centre in Sriharikota by the ISRO. This mission’s main goal is to deploy a lander and rover in the highlands close to the Moon’s South Pole in order to showcase its end-to-end landing and roaming capabilities. The 3900-kilogram Chandrayaan-3 spacecraft is made up of a lander, a rover, and a propulsion module. The rover is comparable to the Vikram rover from Chandrayaan-2, although upgrades have been implemented to ensure a secure landing. The budget of the entire mission of the launch of Chandrayaan-3 is Rs. 615 crore. Today, we will talk about the Chandrayaan-3 Mission 2023: ISRO Launch Date, Time, Place, Budget, and other important information.

Chandrayaan-3 Mission 2023

ISRO has implemented several improvements in Chandrayaan-3 in order to ensure success this time. Reportedly, The launch of Chandrayaan-3 took place at 14 July 2023, at 2:35 pm IST and injection of 100 km circular polar orbit was completed successfully as part of phase one. The lander and rover is expected to land near the lunar south pole region on 23 August 2023. from the Satish Dhawan Space Centre in Sriharikota, Andhra Pradesh

ISRO Chandrayaan-3 Main Point Hightligh

Mission Name Chandrayaan-3
Launch Date July 14, 2023
Launch Time 2:35 pm IST
Article Category Event
Launch Site Satish Dhawan Space Centre, Sriharikota, Andhra Pradesh
Landing Date August 23, 2023 (estimated)
Objectives 1. Demonstrate safe landing and roving on the moon’s surface
2. Study lunar regolith’s thermophysical properties
3. Investigate lunar seismicity
4. Analyze lunar surface plasma environment
5. Study elemental composition near landing site
Previous Mission Chandrayaan-2
– Launched on July 22, 2019
– Partial failure due to Vikram lander crash on the moon
Cost Approximately ₹615 crore
Key Modifications – New lander with four motors instead of five
– Software adjustments
Notable Payload Spectro-polarimetry of Habitable Planet Earth (SHAPE)
– Intended for studying spectral and polarimetric measurements of Earth from lunar orbit
Launch Vehicle LVM3 (Launch Vehicle Mark-III)
– India’s heaviest rocket
– Gross lift-off weight of 640 tonnes
– Length of 43.5 meters
– Payload capacity of 8 tonnes to LEO
– Payload capacity of 4 tonnes to GTO
Status Final integration and testing almost complete
Essential tests to validate spacecraft capabilities already completed
Final launch preparations underway

Objectives of Chandrayaan-3

  • To demonstrate safe and soft landing on the lunar surface.
  • To demonstrate Rover roving on the moon.
  • To conduct in-situ scientific experiments.

Importance of the Chandrayaan 3 Mission

Missions like Chandrayaan hold great significance as they involve the participation of multiple countries. These collaborative endeavors contribute to scientific exchange and foster camaraderie among nations. There is a potential for future international cooperation in exploring the south-polar region of the Moon. This region contains craters that are perpetually shadowed and devoid of sunlight.

These cold, shadowed sites are believed to contain hydrogen, water, ice, and possibly even primordial material that can provide insights into the origins of our Solar System. Additionally, the largest lunar crater is located in the south polar region, and its formation around 4 billion years ago remains a mystery. Exploring and understanding our celestial neighbor will greatly contribute to our understanding of the cosmos.

 What is Budget in Chandrayaan 3?

the budget for Chandrayaan 3 is unveiled. With a staggering allocation of approximately ₹615 crores, this lunar mission demonstrates India’s steadfast commitment to exploring the celestial wonders of the moon.

The mission has three main parts, a lander, rover, and propulsion module. The Orbiter from the previous Chandrayaan-2 mission which is still in the moon’s atmosphere will be used in this new mission

However, this amount may sound huge only to those who aren’t aware of the Chandrayaan-2 mission. That amounts to Rs. 960 crores. In contrast, the maiden mission of India, Chandrayaan-1, was built with a budget of Rs. 386 crores.

It amounted to just 4% of ISRO’s total budget at that time. More than the costs, ISRO is more concerned about seeing how it fares on the moon. It wants the spacecraft to land on the moon with utmost precision. This spacecraft will be the 6th orbital flight of the Launch Vehicle Mark-III or LVM3 rocket.

Chandrayaan 3 Launch Live Stream Today Isro.Gov.In

Chandrayaan 3 is set to launch from the Satish Dhawan Space Centre in Sriharikota in a few hours. The goal is to safely land on the moon’s surface which will happen around 23 August or 24. The ISRO has invited the entire country to watch the live launch of Chandrayaan-3, but registration for attending in person is closed. But you can still watch the Chandrayaan 3 live launch event on ISRO’s official website and WION Youtube channel.

Latest Update:

 the Chandrayaan-3 is expected to be launched on 12 July. This third lunar exploration project will be launched by LVM3. It will take off from Satish Dhawan Space Centre in Sriharikota. The purpose of the mission is to showcase end-to-end capacity in safe landing and roving on the celestial or lunar surface. The following sections will contain more details about this ambitious lunar mission.

Address

  • ISRO Headquarters, Antariksh Bhavan, New BEL Road
    Bengaluru-560 094

    Phone: +91 80 22172294 / 96
    Email: isropr[at]isro[dot]gov[dot]in

 

What is the Launch Date and Time of Chandrayaan 3? 

ISRO has scheduled the launch for July 14, 2023. timing for Chandrayaan 3 is set for 2:35 PM IST

What is Chandrayaan-3?

Chandrayaan-3 is India’s third moon mission, aimed at landing a spacecraft on the moon’s surface and deploying a rover for scientific exploration.

When is Chandrayaan-3 set to launch?

Chandrayaan-3 is scheduled to launch on July 14, 2023.

What is the budget allocated for Chandrayaan-3?

The budget allocated for Chandrayaan-3 is approximately ₹615 crore.

What are the objectives of Chandrayaan-3?

The objectives of Chandrayaan-3 include achieving a successful landing, conducting experiments on the lunar surface, studying the moon’s properties and composition, and advancing scientific knowledge.

What is the launch vehicle for Chandrayaan-3?

The launch vehicle for Chandrayaan-3 is the LVM3 (Launch Vehicle Mark-III), which is India’s heaviest rocket.

What is the current status of Chandrayaan-3?

Final integration and testing are almost complete, and the mission is undergoing final launch preparations.

Leave a Comment